Use this Fence Post Calculator to estimate post quantities across multiple straight runs and calculate concrete volume from your own post-hole dimensions and concrete-bag yield.
Enter the post layout and hole assumptions
Use each straight run separately, then add any gate posts that are not already represented.
Your post and concrete summary
Review posts, bays, equalized spacing and concrete volume from the dimensions you entered.
Post takeoff
How to use the Fence Post Calculator
Enter each straight run and the maximum spacing you are already planning to use. The tool calculates the number of bays needed on each run, converts that to posts, handles shared corners, then estimates concrete from the hole geometry you provide.
Concrete is treated as the cylindrical hole volume minus the approximate volume occupied by a square post. The result is useful for material planning, not foundation design.
Transparent math
Fence-post formulas used
ceil(run ÷ entered spacing)sum(bays + 1) − shared cornersregular posts + extra postsπ × (hole diameter ÷ 2)² × depthpost width² × depthceil(total concrete volume ÷ entered bag yield)Worked example
Example: 100 ft run at an 8 ft spacing assumption
A 100 ft straight run divided by an 8 ft maximum spacing requires 13 bays, so a simple uninterrupted run has 14 line/end posts before any special gate or terminal-post additions. Hole and bag quantities then depend entirely on the dimensions and product yield entered in the form.
Know the limits
Post-hole volume is not post-foundation design
The calculator does not determine required embedment, footing diameter, frost-depth compliance, wind resistance, soil bearing, post section, gate-post reinforcement or concrete specification. Those decisions need project-specific requirements.
Common questions
Fence Post Calculator FAQ
How many posts for 100 feet of fence?
It depends on the spacing assumption and number of separate runs. At an 8 ft maximum spacing, one straight 100 ft run becomes 13 bays and 14 posts.
Why can I add shared corner posts?
If two entered straight runs meet at one corner, calculating each run independently counts that corner twice. The shared-corner field lets you subtract the duplicate.
Does the concrete calculation account for the post itself?
Yes. It subtracts an approximate square-post prism from the cylindrical hole volume.
What bag yield should I enter?
Use the published mixed-concrete yield for the exact bag size and product you plan to purchase.
Related tools